Shaybah Oil Field is a major crude oil production site in Saudi Arabia, developed by Saudi Aramco, located approximately 40 kilometres (25 mi) from the northern edge of the Rub' Al-Khali ("Empty Quarter") desert.
Shaybah Oil Field required to have housing facilities for 1,000 men, administrative offices, an airstrip, a fire station, recreation areas, maintenance and support workshops, and power stations for generation and distribution.
We were able to engineer, procure and construct for the 1000 Man Camp for Saudi Aramco’s Shaybah Oil Field NGL Program. Sitemaster 3 Series Building unit was deployed owing to the extreme weather conditions that the units would require to withstand. The camp for 1000 men was adequately equipped with utilities, and amenities like recreation units, kitchen and dining areas, security houses, and clinic to take care of the health of employees working at the site.
Key Challenges:
Highlights of the project:
Services Offered:
Products Utilized:
Project Units Implemented: